top of page

Divergent Patent Law Blog

Commentary on U.S patent prosecution, PTAB practice, Federal Circuit developments, and cross-border patent strategy.

Electronic Patents, Unexplained Delays: The Case for Issuance Transparency

Writer: Brandon Theiss
Brandon Theiss
Oct 11
9 min read

Executive Summary: The USPTO’s transition to official electronic patent grants has eliminated physical delivery of the legal grant, although optional ceremonial paper copies remain available. A practitioner-reported USPTO estimate of approximately four months between issue-fee payment and grant raises questions about the remaining administrative process, without establishing a national average or the cause of the reported delays.


Introduction

 

A practitioner report that the United States Patent and Trademark Office is advising applicants to expect approximately four months between issue-fee payment and grant raises a particular concern in the era of electronic patents. Physical printing, binding, and postal delivery no longer stand between an application ready for issuance and delivery of its official grant. The remaining administrative interval deserves an explanation.

 

In an October 1, 2026 report, Joshua Goldberg of Nath Goldberg & Meyer described inquiries concerning applications with issue-fee payments at least eight weeks old. He reported that the USPTO’s Application Assistance Unit eventually advised his firm that applications were taking approximately four months from payment to grant, without explaining the estimate. This is a named practitioner’s account of agency communications, not an independently established national average or a published service standard. Joshua B. Goldberg, New Delays in USPTO Patent Granting—A Minor Annoyance? Or Something More Problematic?, Nath Goldberg & Meyer (Oct. 1, 2026), https://nathlaw.com/news/2026/10/01/new-delays-in-uspto-patent-granting-a-minor-annoyance-or-something-more-problematic/.

 

The report provides no application-level histories establishing completed four-month payment-to-grant intervals or confirming when every issuance requirement was satisfied. It warrants investigation and better disclosure, but does not establish the prevalence or precise magnitude of a bottleneck affecting applications ready for issuance.

 

The available evidence does not establish the cause of the reported waits. It does establish a need for greater issuance transparency and operational accountability. Applicants need to know where their applications are waiting, what work remains, and whether improvements at individual stages reduce the total time to grant. Electronic delivery does not make every remaining task instantaneous. Its success should nevertheless be measured against the applicant’s experience across the entire issuance process.

 

The official patent is now an electronic document

 

The USPTO began issuing electronic patent grants, or eGrants, on April 18, 2023. The official grant became an electronic document available through Patent Center on the issue date. In announcing the transition, the Office emphasized streamlined processing, reduced printing and mailing needs, and the potential to reduce pendency. Electronic delivery was therefore presented as an operational improvement with benefits extending beyond reduced paper consumption. U.S. Patent & Trademark Off., USPTO Ushers in New Era With Introduction of Electronic Patent Grants (Feb. 27, 2023), https://www.uspto.gov/about-us/news-updates/uspto-ushers-new-era-introduction-electronic-patent-grants.

 

The distinction between the official grant and a paper copy matters. The USPTO initially continued automatically mailing ceremonial copies to support the transition. Beginning March 9, 2026, applicants paying the issue fee must opt in to receive that courtesy copy. The Office projected approximately $2.5 million in annual printing and mailing savings from the change. Ceremonial copies remain available through that process, and other physical copies can be ordered. The electronic document remains the official statutory grant. U.S. Patent & Trademark Off., Opt-in Option for Courtesy Ceremonial Copies of eGrants (Feb. 6, 2026), https://www.uspto.gov/subscription-center/2026/opt-option-courtesy-ceremonial-copies-egrants.

 

The Office has expressly distinguished the schedule for ceremonial-copy delivery from the schedule for legal issuance. On October 16, 2025, it announced that delivery of courtesy ceremonial copies would be delayed by up to 90 days. The same notice expressly stated that the delay would not affect timely issuance of the electronic grant. U.S. Patent & Trademark Off., Courtesy Ceremonial Patent Copies: Delayed Delivery (Oct. 16, 2025), https://content.govdelivery.com/accounts/USPTO/bulletins/3f75a93.

 

Accordingly, an applicant awaiting a ceremonial copy may already hold an issued patent. An applicant awaiting the electronic grant remains in a materially different position. The current concern is the period before issuance. A queue for producing commemorative copies does not, by itself, explain why a completed application has yet to reach that event. If a shared production dependency is contributing to the delay, the Office should identify it and explain why it remains necessary.

 

The full interval from payment to grant matters

 

The USPTO announced another improvement in April 2025. Effective May 13, 2025, it shortened the interval between Issue Notification and the issue date from approximately three weeks to approximately two weeks. The announcement attributed that change to electronic publication and the elimination of redundant steps. U.S. Patent & Trademark Off., USPTO Modernization Efforts Successfully Expedite Patent Issuance (Apr. 15, 2025), https://www.uspto.gov/about-us/news-updates/uspto-modernization-efforts-successfully-expedite-patent-issuance.

 

That improvement addressed a defined segment of the process. It did not promise issuance two weeks after payment of the issue fee. An application can spend substantial time awaiting processing before an Issue Notification is generated and still pass through the final notification-to-grant interval relatively quickly.

 

The Office should measure the full time from issue-fee payment to grant and separately identify the interval beginning when all outstanding issuance requirements have been satisfied. It should also disclose the component intervals, including the time before Issue Notification. Those measures would distinguish an applicant’s total wait from time attributable to processing an application ready for issuance, while showing whether an improvement in the final stage reduces the overall wait.

 

The remaining administrative work needs a clearer account

 

MPEP § 1309 describes several stages of processing after allowance. Initial data capture begins after the Notice of Allowance is mailed. File maintenance follows to ensure that post-allowance correspondence, fees, and drawings have been incorporated. Once the issue fee has been paid and all other issuance requirements have been met, the application moves to final data capture, where the electronic file is updated for issuance. U.S. Patent & Trademark Off., Manual of Patent Examining Procedure § 1309 (9th ed., rev. 01.2024) [hereinafter MPEP].

 

These functions serve legitimate purposes. The grant must accurately reflect the application in its final condition, including any permitted changes. Electronic delivery eliminates the need to mail the official document, but it does not eliminate the need to prepare that document correctly. The relevant operational question is how much time an application requires for active processing and how much time it spends waiting for that processing to begin.

 

There is official evidence of resource pressure in an adjacent part of the workflow. On May 27, 2026, the USPTO reported that increased application volumes and competing agency priorities had strained staffing resources involved in processing Notices of Allowance. Following a time study and workflow changes, it reduced average NOA processing time from 25 minutes to six minutes per application. Weekly output increased from approximately 6,000–7,000 to approximately 15,000 NOAs, largely clearing the queue awaiting mailing. U.S. Patent & Trademark Off., USPTO Achieves Significant Progress in Reducing Patent Application Notice of Allowance Mailing Pendency (May 27, 2026), https://www.uspto.gov/subscription-center/2026/uspto-achieves-significant-progress-reducing-patent-application-notice.

 

This example illustrates the distinction between active processing time and elapsed waiting time. It concerns allowance notices, which precede issue-fee payment; it does not establish how long final patent preparation should take. Faster NOA processing could increase the volume reaching later stages, but that possible consequence remains an inference. Neither the announcement nor the practitioner report explains the cause of the reported payment-to-grant waits.

 

The available evidence supports a focused inquiry into capacity and workflow. It does not support assigning a precise share of the reported delay to staffing losses, contractors, or particular software systems. The Office is best positioned to identify any affected queues and explain whether a constraint is temporary, recurring, or specific to certain applications.

 

The commercial consequences begin before the patent issues

 

Allowance and issue-fee payment do not confer the ordinary enforcement rights of an issued patent. Although the patent term begins at issuance, the ordinary expiration date for a modern utility or plant patent generally falls twenty years after the relevant filing date, including an applicable earlier application identified by statute. Subject to adjustments and other term rules, delayed issuance can therefore reduce the remaining period of enforceable protection. An applicant cannot treat an allowed application as an issued patent available for an ordinary infringement action. 35 U.S.C. §§ 154(a)(2), 271(a), 281; MPEP § 2701.

 

The practical effect depends on the business. A company confronting competing sales during a product launch may place substantial value on obtaining an issued patent while that launch is underway. A license may make a payment contingent on issuance, or financing terms may require a granted patent by a specified date. Even where the parties can renegotiate, uncertainty about issuance can affect price and bargaining position. These are foreseeable commercial consequences of delayed grant, although their significance must be assessed in the particular transaction.

 

Provisional rights provide only a limited response. Section 154(d) permits a reasonable royalty for qualifying activity during the period after publication and before issuance, subject to statutory conditions that include actual notice of the published application and substantially identical claimed inventions in the publication and issued patent. The entitlement attaches to a patent that ultimately issues. It does not give an applicant a present right to obtain a patent injunction while the application remains pending. 35 U.S.C. § 154(d)(1)–(2).

 

A statutory route to later royalties cannot ensure that a competitor’s activity will be addressed during the market period that matters most. Nor does it resolve a transaction expressly conditioned on issuance. The commercial value of prompt grant can therefore exceed the value of an equivalent number of days added at the other end of the patent’s life.

 

Patent term adjustment provides only partial relief

 

Congress expressly addressed delayed issuance in 35 U.S.C. § 154(b)(1)(A)(iv). For eligible patents, a failure to issue within four months after payment of the issue fee and satisfaction of all outstanding requirements generates a basis for patent term adjustment. Under 37 C.F.R. § 1.703(a)(6), the relevant period begins on the day after that four-month interval and ends on the issue date. 35 U.S.C. § 154(b)(1)(A)(iv); 37 C.F.R. § 1.703(a)(6); MPEP § 2731(I)(F).

 

The starting conditions are consequential. Payment alone does not start this clock if another issuance requirement remains unsatisfied. MPEP § 2731 uses the later of the payment date and the date all outstanding requirements were satisfied, and explains how reopening prosecution can affect the operative date. Counsel evaluating a delayed application must therefore determine when it was actually ready for issuance. MPEP § 2731(I)(F).

 

This issuance-delay component does not compensate the first four months after payment and satisfaction of outstanding requirements. If an otherwise qualifying patent issues twenty days after the applicable four-month date, that component is twenty days before applicable limitations, rather than the entire four-month-and-twenty-day period. 35 U.S.C. § 154(b)(1)(A)(iv); 37 C.F.R. § 1.703(a)(6); MPEP § 2731(I)(F).

 

A separate basis for adjustment, including the three-year pendency provision, may apply during some of those first four months, depending on the prosecution history. The four-month threshold therefore limits this particular issuance-delay component, without determining the patent’s total adjustment. 35 U.S.C. § 154(b)(1)(B); MPEP § 2731(II).

 

The final adjustment also depends on the rest of the prosecution history. Overlapping periods of Office delay are not counted twice, applicant delay can reduce the calculation, and PTA cannot extend the patent beyond the expiration date specified in an applicable terminal disclaimer. Additional term consequently may not provide the benefit an applicant expects from the length of the issuance delay alone. 35 U.S.C. § 154(b)(2); 37 C.F.R. §§ 1.703(f)–(g), 1.704; MPEP § 2731(VI).

 

Design patents present a separate limitation. Their term runs from grant, and they do not receive this form of patent term adjustment. Delayed issuance does not shorten their prescribed term in the same way, but it can postpone the availability of protection during a commercially important period. 35 U.S.C. § 173; MPEP §§ 2701, 2710.

 

The statutory compensation threshold and an appropriate administrative service target answer different questions. Congress’s decision to provide adjustment for qualifying delay beyond four months does not establish that four months is the time reasonably needed to process an application ready for issuance. Section 154(b)(1)(A)(iv) does not itself establish a shorter service target; that policy choice should be informed by evidence about the remaining work and processing capacity. Where adjustment is available, it extends the eventual expiration date but cannot restore a commercial opportunity that has already passed.

 

Applicants need visibility into the issuance queue

 

Meaningful transparency would begin with monthly reporting of both the payment-to-grant interval and the interval after all issuance requirements are satisfied. The Office should publish a median and a measure of longer waits, such as the 90th percentile, with clear definitions of the applications included. These measures would show how long applicants wait without treating every day after payment as time attributable to an application ready for issuance.

 

The data should distinguish applications awaiting applicant action from those ready for issuance. It should identify how long completed applications wait at each administrative stage and whether those queues are growing. This would permit a fair assessment of agency performance while allowing applicants to identify a correctable problem in their own files.

 

A service target and a defined escalation point would give that information practical value. Applicants should be able to obtain a status explanation identifying the outstanding task and responsible unit. When the delay exceeds the target, an inquiry should trigger a review of the application’s position in the queue and any unresolved requirement. Such review need not displace ordinary processing to be useful; it can reveal an overlooked submission or an application that has stopped progressing.

 

The Office should also explain how resources are allocated across the complete allowance-to-grant process. Increasing output at one stage creates an opportunity for faster issuance only if later stages can absorb the resulting work. Reporting those relationships would help determine whether an apparent improvement has reduced total waiting time or relocated it.

 

Electronic grants are a substantial improvement in how the USPTO delivers patents. The reported four-month estimate makes clearer information about the remaining process especially valuable. Applicants should be able to determine whether their applications are ready for issuance and, if so, why they remain pending. The Office’s express distinction between ceremonial-copy delivery and electronic issuance directs attention to the work that precedes the legal grant. Modernization should be assessed by how reliably an application ready for issuance becomes an issued patent, with a prompt explanation when that process takes longer than expected.

 

 
 
About the Author

Brandon R. Theiss

  • LinkedIn
Resize image project - July 22, 2026 at

Brandon R. Theiss is a technology-focused patent attorney with AddyHart’s Divergent IP practice. He advises clients on U.S. patent prosecution, post-grant proceedings, patent eligibility, and patent strategy for technologies including software, cloud computing, data analytics, medical devices, automation systems, and automotive systems. He is an adjunct professor at Villanova School of Law and co-author of FDA and Intellectual Property Strategies for Medical Device Technologies.

Subscribe to Divergent Patent Law Blog
bottom of page